Commodities | Engineering concrete batching plants need to be adjusted frequently. In the process of adjustment, the following points need to be paid attention to:
1. During the adjustment, as long as there are operators on site, other redundant personnel should not be present;
2. Before the adjustment of commodity | engineering concrete mixing plant, check whether the voltage and capacity of each power supply meet the requirements, whether there is leakage or short circuit, and repair it in time if there is any;
3. The adjustment work is also equivalent to the maintenance work. The adjustment staff should clean up the parts that need to be cleaned in the concrete mixing plant;
4. If your mixing station uses a belt conveyor, if the belt conveyor deviates during adjustment, the body must be far away from the machine;
5. If the equipment needs to be powered off during adjustment, it must be powered off;
6. When adjusting the gas circuit, in addition to the power failure, the gas inside must be vented;