With the steady recovery of my country's economy, the construction industry has developed very rapidly in recent years, and the demand for concrete has also increased, and concrete mixing stations have been popularized in many areas. Many batching plants are embarrassed because they have to relocate the batching plant to the next project after this project. The technical staff of Far East Machinery will share with you the precautions for the relocation of concrete batching plants, so that users can reduce damage during relocation.
Precautions for the relocation of concrete batching plants:
1. Disassembly and maintenance of concrete batching plant
1. Delete the previous test: the batching plant is dismantled, we will send personnel to the site to use the equipment and check the operation of the concrete batching plant system to avoid accidental injuries during the demolition process, and to protect the relocation conditions for each component during the relocation process availability.
2. Maintenance before removal of concrete batching plant: In order to ensure that the equipment can maintain normal operation, we clean and oil the overall maintenance before removing the equipment to ensure that the lubricated machinery is in place to prepare for this move, and generally need to check the main other site: concrete mixing The unloading door of the station host powder, the running shaft lubrication, the host machine to discharge the shaken material, the powder discharge port to the warehouse, the discharge port to measure the discharge, the discharge valve, the unloading inlet of the batching machine, with or without the door, the powder silo and Screw out, other parts of the appearance batching plant.
3. Electric control system of concrete mixing station, demolition of gas circuit: the heart of the electric control station, or by professionals who are more familiar with the electrical system in the demolition mixing station, the electrical system is divided into electric and control lines, including strong electric motor cables, control The solenoid valve of the circuit, the limit sensor line, the control line, the control line of the control system, the powerful cabinet and the console are connected to the embrace of the circuit, remove the planned, step by step, the sensor should be prepared with reasonable protection , if necessary, delete the save.
2. Selection of new site for mixing plant
When choosing a site for a mixing plant, it should be ensured that the site is close to the quarry and sand plant, that the water source is sufficient, and that it is far away from residential areas. If the terrain of the hillside can be fully utilized, and the material yard is set on the higher ground level of the hillside, the feeding height of the batching machine can be reduced, so that the climbing angle of the loader feeding material is small or no climbing is required, which not only saves energy, but also reduces the wear. During the basic installation of the equipment, be careful to avoid above-ground and underground optical cables, power supply or communication cables. Determine a reasonable device configuration.