Some customers may think that it is enough to stop the forced mixer after completion. In fact, this idea is wrong. In order to eliminate the hidden safety hazards of the forced mixer in time and ensure that the forced mixer is in good condition, it is necessary to maintain it well after the shutdown. There will be no frequent glitches.
What should be paid attention to after the forced mixer is completed?
A worker should close the gate of the bulk cement tank after using the forced mixer on the same day, transport all the cement in the spiral pipe, and do not leave any cement in the pipe. At the same time cleaning machinery and site.
The concrete in the mixing drum of the two pairs of forced mixers must be cleaned. Maintain the machinery, add lubricating oil to each lubricating point, and oil the parts to be protected to prevent rust.
3. Clean the slurry and ash in all parts of the forced mixer. Clean the dust, adhering concrete and oil stains in the mixing tank and the surface of the whole machine in time to prevent the concrete from drying out and keep it clean. After the production is over, the remaining concrete in the mixer should be cleaned in time before the machine is shut down. After the machine is shut down, put all the operation switches in the open-circuit position, and turn off the power switches.